Plastering Course
Task No :   Task
CBMT   Orientation to Competency Based Training
IN-A01   Introduction to the Building Industry
IN-A02   Safety & Management
IN-A03   Elementary First Aid
BM-A01   Interpret Basic Building Drawings
PT-A01   Surface preparation, mixes & mixing of plaster, screed & grano
PT-A02   Plaster a blank wall
BM-A05   Erect & Dismantle Scaffolding
PT-B01   Plaster door & window openings
PT-B02   Plaster around projecting wall surfaces
PT-B03   Plaster a curved wall
PT-B04   Plaster a recessed arch
PT-B05   Plaster a circular column
PT-B06   Apply a skim coat around door & window openings
PT-B07 (optional)  Repair cracked & damaged plaster
PT-B08   Plaster a square brick column
PT-C01   Plaster a concrete ceiling
PT-C02   Apply skim coat to a concrete ceiling
PT-C03   Plaster a composite board ceiling
PT-C04   Plaster around a ceiling beam
PT-C05   Plaster a curved ceiling
PT-C06   Run in-situ plaster mouldings
PT-C07   Prepare & fix gypsum plaster mouldings
PT-D01   Determine & transfer levels
PT-D02   Lay a screed to a concrete floor & form a plaster skirting
PT-D03   Lay a grano to a concrete floor
PT-D04   Screed concrete steps to a granolithic finish
PT-D05 (optional) Repair granolithic floors