Civil Construction Course
BASIC SITE  SURVEYING
   
 CBMT Orientation to Competency Based Training
BM-A02 Setting out of a Building
CIV-A03 Metric System of Measurement
CIV-SV1a Setting up levelling Instruments and taking Staff Reading
CIV-SV1b Booking Levels and Calculating Reduced Levels
CIV-SV 2a Setting up the Theodolite and Taking Staff Reading
CIV-SV2b Taking Horizontal Angles Using Theodolite
CIV-SV2c Calculating Height of a Building Using Vertical Angles and Distance Measurement Using Stadia Hairs
CIV-SV3 Calculating Levels for a Sewer to be Excavated along Line ABC using Specified Slopes
PRS 2 LEVELING PROCEDURE
Setting up the dumpy level.
Reading the staff.
Taking levels.
Booking.
Calculating reduced levels using height-of-collimation method and rise and fall method.
Setting out a Building
   
PRS 9 USE AND CARE OF THE THEODOLITE
Setting up the theodolite.
Taking readings using theodolite.
Calculate levels for a sewer to be excavated along a line a b c using specified slopes.
Taking angles using theodolite.
Calculating height of building using theodolite readings.
Measure distance using theodolite.